Complete construction of a third trail.
Construction of basic works, pavement, sign posting, etc.
Construction of road links.
Repaving, patching, routing and sealing of cracks and fissures. Embankments for shoulders.
Expansion of several Avenida Costanera - city of Puerto Iguazú. Water works: Concrete and metal sheet, pipes gratings for sinks, ditches. Complementary works such as landscaping, games, lighting, sidewalks, pedestrian railings, benches, etc.
Construction of basic works, pavements bridges (2) 30m. each of them and complementary works – Length 45.50 km. 2 bridges construction with approximation slabs and piles reinforcement and abutments and 2 bridges of 30m. Total 60 meters.
Building reservoirs, pumping station, pavements, bridges, piloting and lighting.
Construction of 3 Km of asphalt road (concrete asphalt). 7.30 m width and sand in refill (3 Km). Precast concrete 120 m long bridge. Light 4 of 30 meters. Board Width 8.30 m. Tended line of medium voltage: 13.2 Kw - Approx. length 3,100 meters. Lighting: 3,500 meters. Concrete Columns: 72.
The layout of this road was developed in area of virgin hills and great steep slopes, mostly in rocky soil-mainly red with broken basalt and cool basalt, using explosives.
It builds a variant of RN No. 8 in Hughes town to avoid the highway to cross. This materializes with a bridge that is under construction, a high pass on the railroad tracks and the current RN No. 8. The embodiment connects with the current road by means of a channeled inyersecção one of its ends and outroextremo a roundabout.