Construction of the main system of sewage sanitation and electrical infrastructure and water from the city of Posadas
Misiones - Argentina
Construction system of sanitation in the city of Posadas and concrete bridge construction / Arroyo Mártires. Rock excavation in urban area w/explosives: 6,121 m3. Total excavation: 89,000 m3. Concrete p/structures: 4,249 m3. Lift stations: 5 Hydraulic capacity: Pumping station No. 5: 0,651 m3/s. Pumping station No. 6: 1,085 m3/s. Population served: 250,000. Submersible pumps: 23. Installed power: 3.000 KVA. Laying of medium voltage line: 33 Kw - Length. Approx. 800 m. 13.2 Kw - 3,700 meters Length. Concrete posts w/60 m.