Hydroelectric complex contract and-C1: construction of the main dam, hydroelectric power and complementary works.
Argentina – Paraguay
Dam and dikes side fill compacted on the Paraná River with sluice-gate navigation, landfill for a flow rate of 55,000 m3/sec, and hydro with 20 u. 160,000 Kw generating each of them.